Cabin Update

Jeremy just pointed out that I never wrote about what the engineer had to say. On the whole it was great news! The holes through the foot of the scissor trusses (in the great room) don't need to be repaired, nor do the holes in the diagonal beam of the bonus room trusses, nor do the holes in the porch trusses. Basically the only holes that need to be fixes are the ones in the 2×10" bottom beam of the bonus room trusses which totally makes sense since they form the joists for the loft floor. The fix is easy too (though time consuming). Basically I have to pull out the wire and re-route it (which means that I'll have to replace some of it) then I need to cut 4' "scabs" out of 2×10" boards and center then over the holes nailing it in place with 10d nails 3" "on center" (OC). I'm trying to find a time when I can get down again to do the work. Hopefully sometime during the middle of next week, but if not then I'm thinking that the Friday after Thanksgiving, I might make it down with my Dad and Brother-in-law.

Don't know if I mentioned it, but the roof is done. However, the siding is pending. The guy I'm having do that work broke his foot and is out of commission for a bit. No worries really since it's not blocking anything else.

The septic system is supposed to be installed any day, but contractors have a bad habit of saying they'll do something on a given day/week and not doing it. I need to call them.

Also, now that the leaves have fallen the view is great (though pictures don't do it justice)... I'm definitely going to have to have a chainsaw party to clear out some of those little trees that block the view other parts of the year.

Close But No Cigar





IMG_0056.JPG


Originally uploaded by aharbick

Today I met Nelson Ailer, an Augusta County inspector, for my first inspections of the cabin. We didn't pass but I think we did pretty well. Here's what needs to happen:
  • Install a second grounding rod
  • Move the grounding wire into the panel (and not the meter base)
  • Install a heater in the kitchen and bathroom
  • Install ducting for the bathroom vent
  • Prep a couple of wires (cut them back, strip housing and prep the grounds)
  • Prepare the plumbing for a pressure test (100lbs on supply lines, and 5lbs on the drain line) and demonstrate
  • Fasten trusses to walls with "hurricane clips"
  • Talk to the engineer and do what he says regarding the holes that were put in the trusses (apparently that's a no no)
  • Shim the center beam on top of the footers

All in all, doesn't sound like tons of work and I mostly know what to do. Another nice bit of news is that I can setup permanent service once I fix the grounding issues.

Cabin Update

It's been a while since I've said anything about the cabin. That's because I've taken a bit of a break for Cub Scout camp and a family vacation. That said, last Friday the electrical and plumbing rough-in work started. I've forgotten to take my camera to chronicle this phase of the work so you'll have to imagine lots of holes drilled in studs, lots of yellow 12-gauge Romex electrical cable, a breaker box with breakers, and lots of junction boxes with switches. The lion's share of the work is being done by my brother-in-law's father Jim who is has been awesome!

Yesterday, I went down to pour a concrete pad for the hot-water heater in the crawlspace. It was perhaps the hardest work I've ever done. I don't know that was mostly due to working in cramped quarters (3.5 foot crawlspace) or from having to dig a 3'×3', 4" deep hole for the pad, or from having to mix and haul 250 pounds of concrete into the crawlspace. Either way, I sweated so much that every last inch of my clothing was soaked. It turned out very nicely, but needless to say, I'm glad it's done.

Today, Jim is finishing off the final electrical tasks and starting the process of adding the plumbing for the drain. Friday, my brother-in-law and Dad are coming down to help finish the work. With any luck, next week I may be ready for inspections.

Say Hello to the Cabin





P1030567.JPG


Originally uploaded by aharbick

We made it! Err, to "dried in" at least. This past weekend we put up the porch trusses, sheathed the roof, laid down roofing tar paper, finished the porch decking, tarred the foundation, and did a bunch of additional framing tasks inside (which I wasn't a part of, but I think the main purpose was for extra bracing and to provide a surface for drywalling). Building houses is very physically demanding, but (at least when it's your own) very satisfying too.



When I embarked on the task of building my own cabin at the persuasion of Don, Scott, and John the task seemed huge and unknown and my fear was that we'd never finish (lest I jinx myself... we may still never finish ;). John, took the drawings and came up with a plan to finish framing the cabin in 4 weekends with 4+ guys every weekend. It was close; from the foundation being laid the day before we were to start to God holding off the rain and giving us BEAUTIFUL weather every weekend to using up every last hour of the 4 weekends (we finished around 5PM on Saturday) but John proved to be right and we did it. Thanks to John, Scott, Don, Dad H., Dad C., Dan, Eric, Jim, Ben, Scott H., Jakob, Carroll, Randy, and Jeremy! You are true brothers. And thanks to Shiree, Aiden, Riley, and Brody for giving me the time to work on it.



There's still a bunch of work to be completed and I hope you can join me over the coming months (I hope to be done before winter) for some of the tasks that I'm not going to hire professionals for. The next time I'll be working on something is the electrical and plumbing rough in (the week of Aug. 20th). Let me know if you're interested!

Half a Roof and Three Quarters of a Porch





P1030484.JPG


Originally uploaded by aharbick

This was by far the most physically demanding weekend and psychologically too I suppose since progress wasn't so visible. At the end of the weekend we had laid the roof plywood and tar paper for half the roof, laid all of the porch decking that we had (ran out) and got the porch headers (or whatever they're called...) in place so that we can hang the porch trusses next week.



I spent all my time on the roof work. We had three guys on that. Two up on the roof and one down below. The guys up top balanced precariously on trusses (or 2"×4" cleats) while hoisting up plywood and tar paper rolls. They then placed the plywood and nailed it down which in itself was a task because the plywood didn't have truss markings so making sure you didn't miss was a chore (amusing too because those nail guns can shoot a 16 penny nail through the plywood really easily). After a row of plywood was down the guys up top rolled out tar paper and tacked it down with dozens of "cap nails" (little one inch nails with a one inch diameter plastic cap). Meanwhile the guy below was cutting plywood (not that hard... just needed a tape measure, chalkline, and circular saw). The hard part of his job was hefting the 4'×8' sheet of plywood up on the roof and once the progress made it's way up to the top he had to heft it onto the first cleat, climb the ladder and heft it to the next cleat, climb the roof to the next cleat where it could finally be passed to the guys now at the top of the roof.



Saturday evening we had all of the guys back to our house and I made steaks for everyone. At the end of the evening I collapsed into bed sore in what seemed every muscle in my body; but a good sore.



When you get inspired enough to build your own cabin here's a tip... When you're working on the roof, bring knee pads.

Cranes Are Cool





DSCN2791.JPG

Originally uploaded by aharbick

...and SOOO worth it. For about $550 we had a crane (operator included) help us set trusses. We had all of them set (about 25) in an hour and half. I can't fathom how hard it would've been to do it by hand. Those suckers had to weigh a couple hundred pounds each and then you're lift it up in this really awkward position and trying to hold it while you nail it down and brace it. Get the crane!

At the end of the weekend, we had finished all of the joists for the front porch, the skirt on the porch, begin laying porch decking, completed the framing for all interior walls, hung all of the trusses, and completed the subfloor in the loft. Pretty amazing progress.

I'm not sure the plan for the weekend yet, but the remaining tasks seem to be: porch decking, roof plywood, roof tar paper, porch trusses and plywood, windows and doors. Getting close to being "dried in!"

Four Walls and a Subfloor


P1030321.JPG
Originally uploaded by aharbick
The rain held off just long enough to get in the foundation footers and the block mason managed to get the foundation finished on Thursday, so on Friday me, John, Scott, and Dad C. went down to continue working on the cabin. We started around 3PM and worked until twilight (around 9PM). I have no clue how fast framers typically work, but in those six hours we fastened the mudsill to the block and laid the entire subfloor (center beam, I-beam joists, and plywood floors).

John and me stayed overnight and slept under the stars even a few shooting ones. It was beautiful (tons of stars were out because the moon was only half full and didn't rise until late at night)! In the morning I rose at dawn and made a tasty "mountain man breakfast" in the dutch-oven (eggs, bacon, green pepper, mushroom, hash browns and cheese all baked together in a quiche-like "pie")

John started measuring, cutting, and marking 2x4" for the walls while I cooked. After eating we laid out studs to start making the two longer walls. Scott, Dad C., Jim, his son Ben, and Eric all joined us and the work really started. Most of us were busy building the walls (nailing in studs, framing the windows, laying the OSB plywood, fastening housewrap, etc.) but Jim, Ben, and Dad C. all contributed to drilling footer holes for the front porch. By the end of the day we had all four exterior walls up and all the footers for the deck drilled and poured with concrete.

The weather was gorgeous, but HOT HOT HOT. We didn't have a thermometer but it was supposed to get into the mid ninetys. Fortunately it wasn't that humid. Just to illustrate how hot it was, 7 guys drank 15.75 gallons of liquids in the weekend.

Next weekend, we may hang the trusses (which are supposed to be delivered on Weds.) or we may do interior walls, and the deck.

Off And Running


P1030235.JPG
Originally uploaded by aharbick
Last weekend me, John (the brains), and Scott went down and started the cabin. The foundation hadn't been completed yet so all of our work was preparatory for this coming weekend. We cut the floor joists (engineered wood I-beams) and did something with one of them that I wasn't paying attention for; basically we covered both sides with plywood. We also built window and door headers (see headers) which are 2X8's and 2x4's; basically a big block of wood that gives structural integrity around a window or door (since you don't want windows and doors to support the weight of a wall).

Today, the footers were dug for the foundation (I'll get a picture this coming weekend), inspected, and poured (concrete). On thursday, the block is supposed to be laid. So pray that it doesn't rain (and that the guy who's doing it didn't have to be paid TOO handsomely to come on short notice ;) Assuming that goes as planned we'll be back down on Saturday to do the floor, and perhaps start on walls. I really have no idea. Like I said John is the brains.

For the record, I'm keeping detailed notes of costs, supplies, process, etc. and I'll eventually get all of that up into this blog so you too can build a cabin ;)

Updates...

Just realized I haven’t updated this in a long time. I’m officially part of the landed gentry, I have a building permit, and my foundation was dug yesterday. Early next week the foundation footers are getting poured and inspected. Then, it may be possible to have the block layed and start building on 6/30 (materials are being delivered on 6/29). If not then, definitely by 7/7. I forgot my camera yesterday, but I’ll try to get a picture of the foundation tomorrow, and I’m definitely going to have pictures of the actual construction.

Aisling


fantasymap
Originally uploaded by aharbick.
Welcome to the new lands of Aisling (oshling - Gaelic for dream).

Shiree and I are buying about 50 acres of land near Craigsville, VA. It's wild and fascinating and our hope is that it'll be a place of escape; a place where the boys can run free. In fact, while I don't claim to be a novelist I hope we can write a story around the land. Aiden and Riley and I started with the map which is actually based on the land. We'll add to it as we discover more, and we'll probably rename things too.

We close on Apr. 16th. After that, there's a bunch of work clearing out brambles on some of the paths, and making access from Greengate down to Basspool easier. I'm also looking at options for building a cabin (either log or stick and frame). More adventures to come!

You can see other pictures here.

What I'm Consuming

About This Archive

This page is a archive of recent entries in the Aisling category.

Brewing is the next category.

Find recent content on the main index or look in the archives to find all content.

Powered by Movable Type 4.01