Cabin Update

It's been a while since I've said anything about the cabin. That's because I've taken a bit of a break for Cub Scout camp and a family vacation. That said, last Friday the electrical and plumbing rough-in work started. I've forgotten to take my camera to chronicle this phase of the work so you'll have to imagine lots of holes drilled in studs, lots of yellow 12-gauge Romex electrical cable, a breaker box with breakers, and lots of junction boxes with switches. The lion's share of the work is being done by my brother-in-law's father Jim who is has been awesome!

Yesterday, I went down to pour a concrete pad for the hot-water heater in the crawlspace. It was perhaps the hardest work I've ever done. I don't know that was mostly due to working in cramped quarters (3.5 foot crawlspace) or from having to dig a 3'×3', 4" deep hole for the pad, or from having to mix and haul 250 pounds of concrete into the crawlspace. Either way, I sweated so much that every last inch of my clothing was soaked. It turned out very nicely, but needless to say, I'm glad it's done.

Today, Jim is finishing off the final electrical tasks and starting the process of adding the plumbing for the drain. Friday, my brother-in-law and Dad are coming down to help finish the work. With any luck, next week I may be ready for inspections.

Categories

0 TrackBacks

Listed below are links to blogs that reference this post: Cabin Update.

TrackBack URL for this entry: http://blog.aharbick.com/MT/mt-tb.cgi/9

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)

What I'm Consuming

About This Post

This page contains a single entry by posted on August 23, 2007 9:29 AM.

Kiva Update was the previous post in this blog.

Quick Tips on Moving to EC2 is the next post in this blog.

Find recent content on the main index or look in the archives to find all content.

Powered by Movable Type 4.01